Traffic

Click to Interact
Type
Location
Description
Time
construction
BoulevardBoth NB/SB
Paving. Flagmen present in Roseland on Boulevard NB/SB between McDonough Blvd and Woodward Ave. Reported by ATLDOT
construction
Joseph E Boone Blvd NWBoth EB/WB
Construction work in Bankhead on Joseph E Boone Blvd NW EB/WB between Mayson Turner Rd/Burbank Dr and Troy St. Reported by ATLDOT
construction
I-285SB
Road work. Left two lanes blocked in Atlanta on I-285 SB between Cascade Rd/Exit 7 and Langford Pkwy (GA-166)/Exit 5. Reported by GDOT
construction
I-285NB
Road work. Left two lanes blocked in Atlanta on I-285 NB between Langford Pkwy (GA-166)/Exit 5 and Cascade Rd/Exit 7. Reported by GDOT
construction
I-20EB
Paving operations. Roadway reduced to two lanes in East Fwy on I-20 EB between Columbia Dr/Exit 66 (EB) and Wesley Chapel Rd/Exit 68. Reported by GDOT
construction
I-20WB
Road work. Two lanes closed in East Fwy on I-20 WB between Panola Rd/Exit 71 and I-285 (Dekalb)/Exit 67. Reported by GDOT
construction
I-85SB
Road work. Right three lanes blocked in Suwanee on I-85 SB between Old Peachtree Rd/Exit 109 and Steve Reynolds Blvd/Exit 103 (NB). Reported by GDOT
construction
I-85NB
Long-term road construction in Opelika AL on I 85 NB between Andrews Rd/Exit 66 and Cusseta (CR-388)/Exit 70
construction
GA-80None
Long-term road construction in Washington GA on Wrightsboro Rd at Big Cedar Rd
construction
Williams RdNone
Widening work in North Columbus on Williams Rd between Whitesville Rd and I-185
construction
US-74Both EB/WB
Bridge replacement in Ducktown TN on Trans-America Trail EB/WB at Copperhill Rd
construction
I-20Both EB/WB
Overnight paving work in Anniston AL on I-20 EB/WB between Oxford/Anniston (AL 21)/Exit 185 and Eastaboga (CR-5)/Exit 173